Arizona’s industrial and commercial markets are growing rapidly. Semiconductor manufacturing, data centers, logistics facilities, healthcare campuses, and large commercial developments are placing significant demands on electrical infrastructure throughout the state.
At the same time, many buildings are operating with aging electrical equipment that was never designed for today’s load profiles or operational expectations. Facility managers are being asked to do more with systems that may have been modified numerous times over the years without updated engineering analysis. The combination of growing electrical demand, changing operating conditions, and aging infrastructure creates additional electrical safety challenges.
Arizona’s extreme summer temperatures introduce another consideration. Electrical equipment may be operating under sustained loads for extended periods, particularly in facilities with significant cooling requirements. While heat alone does not cause an arc flash event, elevated operating temperatures and equipment deterioration can contribute to conditions that increase electrical failure risk. For facility managers, understanding arc flash hazards has become an important part of protecting employees, maintaining reliable operations, and managing the risks associated with increasingly complex electrical systems.
What Is an Arc Flash Event?
An arc flash event is a dangerous electrical discharge that occurs when electricity leaves its intended path and travels through the air between conductors or to ground. When this happens, substantial amounts of energy can be released almost instantly in the form of extreme heat, intense light, pressure waves, and molten metal.
Arc flash events can result from equipment failure, loose electrical connections, improper maintenance, insulation breakdown, contamination, or accidental contact with energized equipment. They can occur in switchgear, panelboards, motor control centers, and other electrical distribution equipment commonly found in commercial and industrial facilities.
Temperatures within an electrical arc can exceed 35,000°F, hotter than the surface of the sun. Within fractions of a second, an arc flash can cause severe injuries, extensive equipment damage, extended downtime, and significant financial losses.
The consequences often extend well beyond the equipment involved. An incident can interrupt production, disable critical building systems, affect adjacent operations, and require extensive investigation before equipment can safely return to service. Facilities may also face regulatory scrutiny, insurance claims, and additional costs associated with replacing damaged electrical infrastructure.
Unlike many equipment failures, an arc flash event presents an immediate threat to personnel working on or near energized electrical systems. Understanding the potential severity of that hazard is essential to establishing appropriate work practices and protective measures.
What Is an Arc Flash Study?
An arc flash study is a detailed engineering analysis that evaluates an electrical distribution system to determine potential arc flash hazards and provide information needed to establish appropriate worker protection measures.
The analysis typically uses IEEE 1584 calculation methods, where applicable, and supports electrical safety practices established under NFPA 70E and applicable OSHA requirements. It evaluates available fault current, incident energy levels, arc flash boundaries, and protective device clearing times. The results help determine appropriate protective equipment and safe work procedures.
The process generally includes field data collection, verification of electrical equipment, updating one-line diagrams, short-circuit analysis, protective device coordination, arc flash calculations, and equipment labeling and reporting.
Each step serves a specific purpose. Short-circuit analysis evaluates the electrical system’s response to fault conditions. Protective device coordination examines how breakers and fuses operate to isolate faults. Arc flash calculations estimate the thermal energy a worker could be exposed to at a specified working distance.
Together, these analyses provide a more complete understanding of the electrical distribution system and the hazards associated with performing work on or near energized equipment.
The completed study should provide more than labels. Facility managers should receive documentation identifying the equipment evaluated, the assumptions used in the analysis, and any conditions that warrant additional attention. This information can help prioritize corrective actions, guide maintenance planning, and support employee training.
NFPA 70E calls for arc flash risk assessments to be reviewed at intervals not exceeding five years, with updates when major modifications or renovations occur. Facilities should also evaluate whether changes to the electrical system affect the accuracy of existing calculations and equipment labels.
Modifications such as adding new equipment, upgrading service capacity, replacing breakers, adjusting protective device settings, or expanding electrical infrastructure can alter fault current levels and system coordination enough to affect arc flash calculations.
For Arizona businesses, arc flash studies should be viewed as part of the facility’s ongoing safety and risk management program, rather than a one-time compliance exercise.
Are Arc Flash Studies Required for Compliance?
While OSHA does not specifically mandate an “arc flash study” by name, employers are required to protect workers from recognized electrical hazards. NFPA 70E provides a widely recognized framework for evaluating electrical hazards and establishing appropriate safety practices.
An arc flash study is an important technical input into that process. It helps facilities understand potential incident energy exposure and determine the protective measures required for electrical work.
From a practical standpoint, facility managers should be able to answer several important questions:
- Can we safely justify energized work when it is necessary?
- Could we demonstrate that our electrical safety program adequately addresses known hazards?
- Are our technicians using PPE appropriate for the tasks and equipment involved?
- Are our equipment labels accurate and consistent with current system conditions?
- Do our procedures reflect the findings of the most recent electrical hazard assessment?
- Would our documentation withstand scrutiny following an incident?
These questions become particularly important when facilities use outside electrical contractors or maintenance providers. Building owners and employers need to coordinate information about known electrical hazards, equipment conditions, and applicable safety procedures so that work can be planned and performed safely.
An arc flash study also has value beyond regulatory compliance. It can identify electrical distribution issues that warrant further investigation, including protective device settings that may contribute to unnecessarily high incident energy exposure.
Addressing these findings can improve the overall electrical safety program while supporting more informed maintenance and capital planning decisions.
How to Select the Right Arc Flash Study Provider
Not all arc flash studies are performed with the same level of rigor or expertise. Choosing the right provider can significantly affect both the accuracy of the analysis and the long-term value it delivers.
1. Ensure Qualified Electrical Engineers Are Performing the Work
Some firms approach arc flash studies as little more than a labeling exercise. A quality provider should have appropriately qualified electrical engineers responsible for the engineering analysis, with professional engineering licensure where required.
Look for experience with power systems, electrical distribution, and industrial or commercial facilities similar to yours. A provider familiar with complex electrical infrastructure will be better equipped to evaluate unusual configurations, identify incomplete information, and recognize conditions that require additional investigation.
For Arizona facilities, confirm that the provider meets applicable state engineering licensure requirements.
2. Ask About Field Verification
One of the biggest challenges in older facilities is inaccurate documentation. Electrical systems may have been expanded, modified, or repaired repeatedly without corresponding updates to drawings and equipment records.
A provider should perform thorough field verification of breakers, switchgear, panelboards, transformers, protective device settings, and relevant cable data.
Field verification is particularly important because calculations based on incorrect equipment information can produce inaccurate results. Even relatively small differences in protective device settings or equipment configurations may affect calculated incident energy.
Ask how the provider handles missing nameplate information, inaccessible equipment, undocumented modifications, and discrepancies between existing drawings and actual field conditions.
3. Understand the Scope of the Engineering Analysis
An arc flash study should be supported by an appropriate analysis of the electrical distribution system.
Ask whether the provider includes short-circuit calculations, protective device coordination analysis, and incident energy calculations as part of the engagement.
These analyses are closely related, although each serves a different purpose. A short-circuit study helps establish the available fault current at different points in the system. Coordination analysis evaluates how protective devices respond to faults. Incident energy calculations use system characteristics and clearing times to estimate potential exposure.
The scope should also clearly identify which equipment will be evaluated and whether utility information, generators, alternate power sources, and other relevant operating configurations will be considered.
This is particularly important for facilities with backup power systems, multiple utility feeds, or complex distribution arrangements.
4. Evaluate the Quality of the Final Deliverables
A completed arc flash study should provide facility managers with usable information, not simply a technical report that is filed away.
Typical deliverables may include updated one-line diagrams, equipment-specific arc flash labels, engineering calculations, documented assumptions, and recommendations for addressing identified concerns.
Ask whether the provider will explain the findings, identify equipment with elevated incident energy levels, and help the facility understand which issues deserve priority attention.
The report should also make it possible to update the analysis as equipment changes over time. Clear documentation of the electrical system and the study’s assumptions can reduce the time and expense required for future revisions.
5. Look for Recommendations That Extend Beyond Labeling
A useful study may identify opportunities to reduce electrical hazards through changes to equipment, protective device settings, maintenance practices, or operating procedures.
For example, protective device coordination analysis may reveal opportunities to reduce fault clearing times, subject to equipment capabilities and system requirements. In some facilities, this can help lower calculated incident energy.
Other findings may point to aging equipment, inadequate documentation, or system configurations that warrant additional engineering review.
The provider should distinguish between immediate safety concerns, potential engineering improvements, and longer-term capital recommendations. This allows facility managers to develop a practical action plan rather than treating every finding as an equally urgent issue.
6. Consider How the Study Will Be Maintained Over Time
Electrical systems rarely remain unchanged. Facilities add equipment, replace components, modify distribution systems, and adjust operations to meet changing business needs.
Ask prospective providers how they support future study updates and what information should be retained to make subsequent reviews more efficient.
Facilities undergoing frequent expansion may benefit from establishing a process to evaluate arc flash implications whenever electrical modifications are proposed.
This helps prevent a situation in which equipment labels and engineering documentation gradually become disconnected from the electrical system actually operating in the building.
Turning Arc Flash Study Findings Into an Ongoing Safety Program
Completing an arc flash study is an important milestone, although the greatest value comes from putting its findings into practice.
Facility managers should use the results to confirm that equipment labels are current, review electrical work procedures, identify training needs, and evaluate recommended corrective actions.
The findings can also inform scheduled electrical maintenance. Equipment condition, protective device performance, and changes in electrical loading can influence the assumptions underlying an arc flash assessment.
Facilities should establish clear responsibility for maintaining electrical documentation and evaluating system modifications. When new equipment is installed or distribution systems are changed, the potential impact on existing arc flash calculations should be considered before the work is completed.
This is especially relevant for Arizona businesses investing in facility expansions, additional production equipment, increased cooling capacity, or new power infrastructure.
An ongoing approach also helps facility managers coordinate engineering, operations, maintenance, and safety responsibilities. Each function plays a role in ensuring that the electrical system remains properly documented and that employees have accurate information when planning work.
Building Electrical Safety Into Arizona’s Growth
Arizona businesses are operating increasingly complex electrical systems in some of the country’s most demanding environments. Growing power requirements, evolving facility operations, and aging infrastructure make it essential to understand the hazards associated with electrical distribution equipment.
Arc flash studies provide the engineering foundation for evaluating those hazards and establishing appropriate protective measures. Their value extends beyond compliance to improved documentation, better maintenance planning, and more informed decisions about electrical infrastructure.
For facility managers, the priority is to ensure that the study reflects the electrical system as it exists today, that findings are translated into appropriate actions, and that the analysis remains current as the facility evolves.
As Arizona’s industrial and commercial infrastructure continues to expand, that discipline will become increasingly important to protecting people, equipment, and operations.