Office 480-607-9797
24 Hour Service 480-607-8209

Project Showcase

  • CityScapePhoto2

  • CityScape Block 22

    CityScape Block 22

  • kierlandphase4A1a-2

  • aguafriahs

  • Scottsdale Waterfront

  • armynationalguard1

  • Banner Health Center

  • padresclubhouse

  • Pima-Norte

  • usairways

  • accutronics

  • allsaints

  • azofficetech

  • caremark

  • delwebhospital

  • coronadohs

  • wellsfargo

  • Delcor

  • delwebhospital2

  • Gateway_IEB_3

  • pinnaclecorporatecenter1_1b

  • usforestservice1

  • horizonhs

  • parksidecommerceplace

  • Scottsdale-Waterfront2-Lam

  • King-David

  • sigler

  • sunsetvistaelementary1

  • parksidetech

  • supai

  • Verrado

  • villagecamelbackclub1

  • CityScape
  • CityScape Block 22
  • Kierland Commons
  • Agua Fria High School
  • Scottsdale Waterfront
  • Army National Guard
  • Banner Health Clinics
  • Padres Clubhouse Renovation
  • Pima Norte
  • US Airways
  • Accutronix
  • All Saints Lutheran Church
  • Arizona Office Technologies
  • Caremark Phase II
  • Del Webb Hospital
  • Coronado High School
  • Wells Fargo
  • Delcor
  • Del Webb Hospital
  • Gateway Community College IEB
  • Pinnacle Corporate Center
  • U.S. Forest Service
  • Horizon High School
  • Parkside Commerce Place
  • Scottsdale Waterfront
  • The King David School
  • Sigler and Reeves
  • Sunset Vista Elementary School
  • Parkside Tech II
  • Supai Middle School
  • Verrado Middle School
  • Village Camelback Club

 

CityScape Block 22

CityScape Block 22Location: Phoenix, Arizona

General Contractor: Hunt Construction Group

Owner: RED Development

Construction Duration: 19 months 

Project Description: 
A 27-story 618,000 SqFt Class “A’ Office Building, including 1200 car underground parking structure, 44,000 SqFt retail space, included shared space and offsite utilities. We were contracted as a design assist partner for Hunt Construction. This high profile project was com­pleted under budget and ahead of schedule. The electrical systems on this project consist of 15,000 amps of 277/480 volt power with buss risers, motor control centers, lighting control systems, and energy management. Jenco worked to coordinate with APS, the power utility, to provide lighting, convenience power, imbed strut systems, arboron barriers, and auxiliary gutters for feeds to the (4) service entrance systems from their network vaults. The project began prior to final design drawings, and we were able to work through   design issues while maintaining a strict budget. Jenco  also worked in partnership with Hunt to make this project OSHA VPP (Voluntary Protection Program) certified.

Gateway Community College IEB

gateway-thumbLocation: Phoenix, Arizona

General Contractor: CORE Construction

Owner: Maricopa Community Colleges

Construction Duration: 20 months

Project Description: 
The Gateway Community College Integrated Education Building measuring 120,000 square feet was completed in 2012. The IEB provides space for classrooms, offices, indoor and outdoor art studios, library, science labs, learning center, student services, café, performance arts, career services, enrollment services and counseling and disability support services.

Scottsdale Waterfront

Scottsdale Waterfront 2Location: Scottsdale, Arizona 

General Contractor: OPUS West 
Construction Duration: 16 months 

Project Description: 
The project consisted of a 400 parking unit and luxury condominium buildings located at Camelback Road and Scottsdale Road. The construction included two 13 story  towers, three below grade parking levels, site improvements, complete tenant metering and fire alarm. Each tower included 200 units ranging from 900 sq. feet to 3,000 sq. feet with all the clubhouse amenities in each building.

This project was a fast track build that started with approved shell with TI approver on a floor by floor approval. This enabled us to prefab and stock each floor as the building went up.

Banner Health Clinics

Banner Health CenterLocation: Four clinics: Chandler, Queen Creek, Mesa & Gilbert 

General Contractor: Kitchell Contractors 

Owner:
 Banner Health

Construction Duration: 
9 months 

Project Description: 
In just 8 short months, Jenco was able to complete four 21,000 square foot healthcare clinics for Banner Health. The four facilities. located in Chandler, Queen Creek, Mesa and Gilbert, all have exam rooms, procedure rooms and laboratory services. Because each facility was similar we were able to heavily prefab the projects and implement Lean methodologies.

University of Arizona Arbol de la Vida Hall

Arbol HallLocation: Tucson, Arizona 

General Contractor: CORE Construction

Owner: University of Arizona

Construction Duration:
 19 months

Project Description: 
These new, sustainable, multi-story buildings were designed to serve as residence halls for undergraduate students attending the University of Arizona. Buildings Tyndall and High­land hold 800 beds with traditional suite style double rooms and adjoining bathrooms. Each residence hall building also includes various gathering spaces and lounges, a lobby, study rooms, kitchen/dining space, laundry  rooms, a small conference room, a recreation room and enclosed outdoor space.

Cable One Corporate Headquarters

Cable One ExteriorLocation: Phoenix, Arizona 

General Contractor: Jokake Construction 

Owner:
 Cable One 

Construction Duration:
 6 months 

Project Description: 
150,000 square foot, new class ‘A’ office renovation of existing 6-story building in downtown Phoenix. The project included many challenges and Jenco was ready. We were awarded a pre-construction, design/assist contract and went to work. We uncovered several key items that led to major savings and ROI for our client, including uncovering utility and city rebates in excess of $200,000.